The Ohio State University Medical Center

  • 60 Additional Beds
  • 63,000 SF of New Construction
  • Project Value: $32 million
  • Synergent Services:
    • Automated Transport System (ATS) Design and RFP Documents
    • Integration of ATS Design into Building Construction Documents
    • ATS Vendor Contract Administration
    • Commissioning
    Synergent Contributions:
    • Eliminated design constraints which had created traffic bottlenecks in the original design.
    • Improved delivery times while simultaneously increasing traffic
      volumes by 125%.
    • Developed interim delivery strategies to support continued delivery service during construction.
    • Managed ATS vendor contract within budget and with zero vendor-initiated change orders.
    Scope of Project (2005-2008)
    • $840,000 in ATS Equipment and Software
    • ATS Service Pathways on All Floors
    • ATS Elevator Service to Two Additional Floors
    • Conversion of Unused Cart Queue into Backup Cart Depot
    • One (1) Additional AGV Battery Charger
    • Fifty (50) Additional Carts
    Key Synergent Consultants:

Central Sterile Supply Department

The Ohio State University Medical Center
Project Value: $7.2 million

The Ohio State University Medical Center photo

Hospital Operations Value Analysis

Washington Adventist Hospital
Project Value: $200 Million

Washington Adventist Hosptial Operations Value Analysis photo

Hospital Renovations for ATS

The Ohio State University Medical Center
Project Value: $4.1 Million

The Ohio State University Medical Center photo
Our consultants approach their work within the context of the challenges facing your hospital, not from a predefined set of templates.

We listen.

We perform.

We deliver.

Find Us

Mailing Address:
9446 Haaf Farm Court
Pickerington, Ohio 43147

info@synergentllc.com
(614) 286-0258